Tuesday, May 29, 2012

[royalcliff] MBA Project

 

Hello Fellow Residents,
Need your help for MBA project work. Would be grateful for 20 min of your time for filling the attached form on link   https://www.surveymonkey.com/s/SOIHP02CR  . Kindly note this is only for academic project work to be submitted at 'Narsie Monzie Institute of Management Studies'. Under column 2 of the attached survey questioner - 'Who referred you for this Survey', kindly fill - 'Shivam Lakhanpal'   

Thanks for your Co-operation
Best Regards

Capt Sanjay Pal

__._,_.___
Recent Activity:
.

__,_._,___

Re: [CROMA] Latest Action by CROMA- Non Supply of Electricity for 30 HRS /Frequent Power cut @ Crossings Republik Township

 

Thanks for taking this initiative. It is really commendable.

~Sunny


From: Akhil Pal Chhabra <75chhabra@gmail.com>
To: crossingsrepublikownersandmembersassociation-croma <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>; crossings <crossings-republik@yahoogroups.com>; assotech-group <AssotechNest@yahoogroups.com>; assotech-the-nest@commonfloor.com; ajnara_genx@yahoogroups.com; Amrapali_Empire@yahoogroups.com; gardeniasquare@yahoogroups.co.in; gaurglobalvillage_cr@yahoogroups.com; ggvcnh24@yahoogroups.co.in; ParamountGroup@yahoogroups.com; paramountsymphony@yahoogroups.com; panchsheel_wellington@yahoogroups.com; a <Panchsheel_Xing@yahoogroups.com>; supertechlivingston@yahoogroups.com; Mahagun Mascot <mahagunmascot@yahoogroups.com>; mascotrwa@googlegroups.com; royalcliff@yahoogroups.com; royalcliffrwa@yahoogroups.com; Arihant_Ambience@yahoogroups.co.in
Cc: cromaexecutivebody@googlegroups.com
Sent: Monday, 28 May 2012 1:47 PM
Subject: [CROMA] Latest Action by CROMA- Non Supply of Electricity for 30 HRS /Frequent Power cut @ Crossings Republik Township

 
Dear All

All update from CROMA on electricity /power cut issue is that on Friday because of long power failure, CROMA team met at late night near Power Station, Gate No.2, Crossings Infra. After meeting , CROMA had heated arguments with the power station operators because of non supply and they informed that their was some line default. Thereafter team visited the near the police station to lodge FIR against the Crossings Management for non supply of electricity despite supply of electricity in the neighboring areas and entire Ghaziabad City. However FIR was not lodged due the reason that power failure was due to some technical errors in wiring as informed by senior officers of crossings management on talking to them over the phone. At the spot Chief Security Officer, Col. Siddique reached and tried to control the situation and anger of CROMA team. After talking to the management late night at about 1.30 am , by Mr. Gurmulh Singh, President-CROMA, meeting was fixed for next morning with Crossings Management to understood the correct picture .Thereafter few members of CROMA had a meeting with CEO, Electrical Head & GM(Elect) of Crossing Management at 11a.m on last Saturday i.e. 26.05.2012. After deliberations on the issues raised by CROMA team on Saturday with Crossings Management, specifically with Sh. D. Kumar on technical issues, they assured that the disrupted electricity work will be done at an emergency level and further assured that they will share their future plans on development of Power Station with sufficient power load for the entire township.Also management share the detail chart of power supply from UPPCL and power cut in the month of May which are attached herewith.

Very soon CROMA will have a NEXT meeting on the subject with Crossings Management to understand the detail action plan to control the electricity problems in the township in future...Request the members who are well versed with Electricity Issues please come forward to join for the meeting so that correct picture can be understand with their help and knowledge....

Hope for the best in future for electricity supply 

Warm Regards

Akhil P.Chhabra
PR & Legal Team-CROMA


__._,_.___
Recent Activity:
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]
.

__,_._,___

Monday, May 28, 2012

[ParamountGroup] Hotel Near Indirapuram/Crossings Republik

 

Hi

Please let me know a decent hotel which provides AC accommodation and decent meals near Indirapuram/CR area.
Its for a family stay, so safety is top most.

Thanks
Jitin Arora

Email: jitin.a@gmail.com

__._,_.___
Recent Activity:
.

__,_._,___

[ParamountGroup] Maintenance other charges by 1st June,2012

 

Hi,

I have been given a date in June for registeration so hopefully it will be done soon. I received another letter that the maintenance, electricity and other charges would begin from 1st June.

Its been told to activate the pre-paid system and to put in funds.
So all those who are not already living there have you all paid up yet. and i hve been trying to call them to find out the how much approx are these charges per month....

Anyone who has a fair idea about this kindly respond ASAP

Regards
Rahul

__._,_.___
Recent Activity:
.

__,_._,___

Re: [CROMA] Latest Action by CROMA- Non Supply of Electricity for 30 HRS /Frequent Power cut @ Crossings Republik Township

 

Gud to c this action and action for dumping ground from Croma.

Otherwise we were getting impression that Croma is only for informing something happened in Crossing instead of taking lead and finding solution.


Manmohan Jha,
09212313580,
Sent from my BlackBerry® from Tata Indicom

From: Akhil Pal Chhabra <75chhabra@gmail.com>
Sender: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Date: Mon, 28 May 2012 13:47:27 +0530
To: crossingsrepublikownersandmembersassociation-croma<CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>; crossings<crossings-republik@yahoogroups.com>; assotech-group<AssotechNest@yahoogroups.com>; <assotech-the-nest@commonfloor.com>; <ajnara_genx@yahoogroups.com>; <Amrapali_Empire@yahoogroups.com>; <gardeniasquare@yahoogroups.co.in>; <gaurglobalvillage_cr@yahoogroups.com>; <ggvcnh24@yahoogroups.co.in>; <ParamountGroup@yahoogroups.com>; <paramountsymphony@yahoogroups.com>; <panchsheel_wellington@yahoogroups.com>; a<Panchsheel_Xing@yahoogroups.com>; <supertechlivingston@yahoogroups.com>; Mahagun Mascot<mahagunmascot@yahoogroups.com>; <mascotrwa@googlegroups.com>; <royalcliff@yahoogroups.com>; <royalcliffrwa@yahoogroups.com>; <Arihant_Ambience@yahoogroups.co.in>
ReplyTo: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Cc: <cromaexecutivebody@googlegroups.com>
Subject: [CROMA] Latest Action by CROMA- Non Supply of Electricity for 30 HRS /Frequent Power cut @ Crossings Republik Township

 

Dear All

All update from CROMA on electricity /power cut issue is that on Friday because of long power failure, CROMA team met at late night near Power Station, Gate No.2, Crossings Infra. After meeting , CROMA had heated arguments with the power station operators because of non supply and they informed that their was some line default. Thereafter team visited the near the police station to lodge FIR against the Crossings Management for non supply of electricity despite supply of electricity in the neighboring areas and entire Ghaziabad City. However FIR was not lodged due the reason that power failure was due to some technical errors in wiring as informed by senior officers of crossings management on talking to them over the phone. At the spot Chief Security Officer, Col. Siddique reached and tried to control the situation and anger of CROMA team. After talking to the management late night at about 1.30 am , by Mr. Gurmulh Singh, President-CROMA, meeting was fixed for next morning with Crossings Management to understood the correct picture .Thereafter few members of CROMA had a meeting with CEO, Electrical Head & GM(Elect) of Crossing Management at 11a.m on last Saturday i.e. 26.05.2012. After deliberations on the issues raised by CROMA team on Saturday with Crossings Management, specifically with Sh. D. Kumar on technical issues, they assured that the disrupted electricity work will be done at an emergency level and further assured that they will share their future plans on development of Power Station with sufficient power load for the entire township.Also management share the detail chart of power supply from UPPCL and power cut in the month of May which are attached herewith.

Very soon CROMA will have a NEXT meeting on the subject with Crossings Management to understand the detail action plan to control the electricity problems in the township in future...Request the members who are well versed with Electricity Issues please come forward to join for the meeting so that correct picture can be understand with their help and knowledge....

Hope for the best in future for electricity supply 

Warm Regards

Akhil P.Chhabra
PR & Legal Team-CROMA

__._,_.___
Recent Activity:
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]
.

__,_._,___

[CROMA] Latest Action by CROMA- Non Supply of Electricity for 30 HRS /Frequent Power cut @ Crossings Republik Township

 

Dear All

All update from CROMA on electricity /power cut issue is that on Friday because of long power failure, CROMA team met at late night near Power Station, Gate No.2, Crossings Infra. After meeting , CROMA had heated arguments with the power station operators because of non supply and they informed that their was some line default. Thereafter team visited the near the police station to lodge FIR against the Crossings Management for non supply of electricity despite supply of electricity in the neighboring areas and entire Ghaziabad City. However FIR was not lodged due the reason that power failure was due to some technical errors in wiring as informed by senior officers of crossings management on talking to them over the phone. At the spot Chief Security Officer, Col. Siddique reached and tried to control the situation and anger of CROMA team. After talking to the management late night at about 1.30 am , by Mr. Gurmulh Singh, President-CROMA, meeting was fixed for next morning with Crossings Management to understood the correct picture .Thereafter few members of CROMA had a meeting with CEO, Electrical Head & GM(Elect) of Crossing Management at 11a.m on last Saturday i.e. 26.05.2012. After deliberations on the issues raised by CROMA team on Saturday with Crossings Management, specifically with Sh. D. Kumar on technical issues, they assured that the disrupted electricity work will be done at an emergency level and further assured that they will share their future plans on development of Power Station with sufficient power load for the entire township.Also management share the detail chart of power supply from UPPCL and power cut in the month of May which are attached herewith.

Very soon CROMA will have a NEXT meeting on the subject with Crossings Management to understand the detail action plan to control the electricity problems in the township in future...Request the members who are well versed with Electricity Issues please come forward to join for the meeting so that correct picture can be understand with their help and knowledge....

Hope for the best in future for electricity supply 

Warm Regards

Akhil P.Chhabra
PR & Legal Team-CROMA

__._,_.___
Recent Activity:
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]
.

__,_._,___

[gardeniasquare] Latest Action by CROMA- Non Supply of Electricity for 30 HRS /Frequent Power cut @ Crossings Republik Township [2 Attachments]

 
[Attachment(s) from Akhil Pal Chhabra included below]

Dear All

All update from CROMA on electricity /power cut issue is that on Friday because of long power failure, CROMA team met at late night near Power Station, Gate No.2, Crossings Infra. After meeting , CROMA had heated arguments with the power station operators because of non supply and they informed that their was some line default. Thereafter team visited the near the police station to lodge FIR against the Crossings Management for non supply of electricity despite supply of electricity in the neighboring areas and entire Ghaziabad City. However FIR was not lodged due the reason that power failure was due to some technical errors in wiring as informed by senior officers of crossings management on talking to them over the phone. At the spot Chief Security Officer, Col. Siddique reached and tried to control the situation and anger of CROMA team. After talking to the management late night at about 1.30 am , by Mr. Gurmulh Singh, President-CROMA, meeting was fixed for next morning with Crossings Management to understood the correct picture .Thereafter few members of CROMA had a meeting with CEO, Electrical Head & GM(Elect) of Crossing Management at 11a.m on last Saturday i.e. 26.05.2012. After deliberations on the issues raised by CROMA team on Saturday with Crossings Management, specifically with Sh. D. Kumar on technical issues, they assured that the disrupted electricity work will be done at an emergency level and further assured that they will share their future plans on development of Power Station with sufficient power load for the entire township.Also management share the detail chart of power supply from UPPCL and power cut in the month of May which are attached herewith.

Very soon CROMA will have a NEXT meeting on the subject with Crossings Management to understand the detail action plan to control the electricity problems in the township in future...Request the members who are well versed with Electricity Issues please come forward to join for the meeting so that correct picture can be understand with their help and knowledge....

Hope for the best in future for electricity supply 

Warm Regards

Akhil P.Chhabra
PR & Legal Team-CROMA

__._,_.___

Attachment(s) from Akhil Pal Chhabra

2 of 2 Photo(s)

Recent Activity:
.

__,_._,___

Sunday, May 27, 2012

Re: [CROMA] Re: [gardeniasquare] CROMA FINAL ACTION PLAN ON DUMPYARD -FILING PETITION IN SUPREME COURT

 

What happened to "Stay Order" by Supreme Court" 
 
Warm Regards
 
Sunit Rai

 
 


From: mohit kalra <kalra.mohit@gmail.com>
To: crossingsrepublikownersandmembersassociation-croma <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Cc: crossings <crossings-republik@yahoogroups.com>; assotech-group <AssotechNest@yahoogroups.com>; assotech-the-nest@commonfloor.com; ajnara_genx@yahoogroups.com; Amrapali_Empire@yahoogroups.com; gaurglobalvillage_cr@yahoogroups.com; ggvcnh24@yahoogroups.co.in; ParamountGroup@yahoogroups.com; paramountsymphony@yahoogroups.com; panchsheel_wellington@yahoogroups.com; a <Panchsheel_Xing@yahoogroups.com>; supertechlivingston@yahoogroups.com; Mahagun Mascot <mahagunmascot@yahoogroups.com>; mascotrwa@googlegroups.com; royalcliff@yahoogroups.com; royalcliffrwa@yahoogroups.com; Arihant_Ambience@yahoogroups.co.in
Sent: Wednesday, 23 May 2012 10:49 AM
Subject: [CROMA] Re: [gardeniasquare] CROMA FINAL ACTION PLAN ON DUMPYARD -FILING PETITION IN SUPREME COURT

 
Thanks CROMA Team for your efforts and decision on taking battle to Next level. Look forward for the detailed plans and how much fund is required. 

Mohit
On Wed, May 23, 2012 at 10:19 AM, Akhil Pal Chhabra <75chhabra@gmail.com> wrote:
 
[Attachment(s) from Akhil Pal Chhabra included below]
Dear Members,

This is for the information of all that CROMA has decided action plan on Dumpyard issue and filing Special Leave Petition in Supreme Court. Decision is taken after consultations with various Supreme Court Advocates. Considering the competency and minimum fee charges an Advocate has been consulted and finalised in the Executive Body Meeting of CROMA on last Saturday i.e the 19th of May 2012 

CROMA is going to start fund drive very soon and will provide the other details of filing the petition to all the residents from time to time on yahoo groups and facebook pages. 

Regards,
Gurmukh Singh
President-CROMA 





__._,_.___
Recent Activity:
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]
.

__,_._,___

[ParamountGroup] Re: [Paramount Symphony] hi frinds. tell me one thing how many of you...

 

Hi All,
 
Wooden work (Modular Kitchen + two wardrobes) in my flat has already been done by a very professional person in this field.
 
I am very much satisfied with the quality of work he has done.
 
If somebody is interested can talk to him directly:
 
Ishu Kitchen World
Sonu Kumar (9990497562, 9540626484, 9210832864 & 01206451562)
 
Regards,
Vineet Saraswat
Nimbus 2006.
 


 
2012/5/27 Yogesh Jagatram <notification+zrdoe6epdho1@facebookmail.com>

hi frinds. tell me one thing how many of you...
Yogesh Jagatram 27 May 17:25
hi frinds. tell me one thing how many of you really want to get your wodden work done by some one professional and not by any one ordinary....i really need to know the numbers in ps

View Post on Facebook · Edit email settings · Reply to this email to add a comment.


__._,_.___
Recent Activity:
.

__,_._,___

Saturday, May 26, 2012

[RWA-Mascot:735] Play School - Gen Next Sector 62 NOIDA


Dear All,

I am looking for a company for my kid who has started going to a play school (Gen Next) at A-13/5, Sector 62 NOIDA. His school timings are from 10:30 a.m. to 12:30 p.m.

Gen Next also has a Day Boarding facility.

If anyone is interested in sending their kids at Gen Next, they can contact Kajal at 9560362363.

You can also call @ 9560361362 or 9650362363. You can also visit the school website (www.gennextschools.com)

Regards,

Priyanka Bhatnagar









[CROMA] Play School - Gen Next Sector 62 NOIDA

 

Dear All,

I am looking for a company for my kid who has started going to a play school (Gen Next) at A-13/5, Sector 62 NOIDA. His school timings are from 10:30 a.m. to 12:30 p.m.

Gen Next also has a Day Boarding facility.

If anyone is interested in sending their kids at Gen Next, they can contact Kajal at 9560362363.

You can also call @ 9560361362 or 9650362363. You can also visit the school website (www.gennextschools.com)

Regards,

Gagan Bhatnagar




__._,_.___
Recent Activity:
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]
.

__,_._,___

[ParamountGroup] Re: Advise from those who have got registeration done

 

thnx Nitin for the info....!!!

--- In ParamountGroup@yahoogroups.com, "nitin_hps1" <nitin_hps1@...> wrote:
>
> sorry rahul ..made a mistake below in hurry.. circle rate is actually lower .. we do registry on 7%of BSP
>
> --- In ParamountGroup@yahoogroups.com, "nitin_hps1" <nitin_hps1@> wrote:
> >
> > Rahul,
> > Builder will do everything once you settle all your dues with them ..Builder has its own lawyer who will get the registry done ..
> > Circle rate is aropund 16K per sqmtr ..and registry will be done on circle rate only ..as it is higher ..
> > Regards
> > Nitin
> >
> > --- In ParamountGroup@yahoogroups.com, "rahul_85amd" <rahul_85amd@> wrote:
> > >
> > > Hi all,
> > >
> > > Require some advise on the registeration procedure. Do the builders direct you to the process and the required lawyers or do we ourselves have to search for the appropriate lawyer to get the papers done?
> > >
> > > Also what is the circle rate going on?? and How to calculate the amount so that we can keep it ready for disbursement.
> > >
> > > Kindly reply As soon as possible.
> > >
> > > Thank You
> > > Regards
> > > Rahul
> > >
> >
>

__._,_.___