Perhaps residents are facing serious problems due to never lasting work being done frequently on DG and lifts. Even with increased occupancy level in last 1 year We still have 1 DG.......
Hi
All
Daily
power cut status:
Only
28 min cut from UPPCL to CIPL and CIPL to Assotech. If power cut is more
than 28 min that may be because of Assotech internal issue.
Does anyone have idea what was the
duration of power cut in Assotech?
Daily Power cut Status of U.P.P.C.L./C.I.P.L. Supply
Daily power cut
status of UPPCL supply
From 10.00Hrs. Of 19.02.14 to 10.00Hrs. Of
20.02.14
S. No.
Date
From
To
Hrs.
Mints.
Remarks
1
19.02.14
13.32
13.34
0
02
2
19.02.14
14.10
14.36
0
26
3
20.02.14
Nil
Nil
Nil
Nil
Total Time
00
28
Daily power cut status of Crossings Republik Supply
From 10.00Hrs. Of 19.02.14 to 10.00Hrs. Of
20.02.14
S.No
Date
From
To
Hrs.
Mints.
Action Taken
Remarks
Feeder No.-04 M/s.
Gaur Global, Saviour, Supertech, Paramount,
Mahagun, panchsheel,Ajanra,Assotech, Gardenia,Arihant,Bulland,
Prateek,
KSN Bulider,Varuna,Sam Residency, Sam (India)
promoters, Proview , Cosmos, Skytech,Exotica.
Regards
Aftab
On Wed, Feb 19, 2014 at 12:40 PM, Mayank Bhatnagar
hi all,Its a good way to confirm we are not switched to DG even if we are not getting cut fromUPPCL.
Aftab, its good the reports you rbrought out.
I think now residents will be equally alert in knowing when was DG used even if UPPCL was supplying power.
-regds
Mayank
On Wed, Feb 19, 2014 at 11:57 AM, Mohd Aftab
Power cut was only for below society as per CIPL.
Dated:-
18.02.14
NOTE:-
Paramount disconnect
under Planned Shut Down w.e.f. 07.57Hrs, to 21.00Hrs.
Gardenia disconnect under planned shut down w.e.f. 15.00Hrs. To 19.20Hrs.
Porview disconnect under Planned shut down w.e.f. 17.00Hrs, to
21.00Hrs.
Dated:- 19.02.14
NOTE:-
Paramount disconnect
under planned shut down w.e.f. 07.53Hrs, to
till time
Proview disconnect under planned shut down w.e.f. 08.05Hrs, to till
time.
Regards
Aftab
Regards
Aftab
On Wed, Feb 19, 2014 at 11:50 AM, R K Gupta (Project/Noida)
18th evening – approx. 6-10 mins ( around 8.30PM)
19th morning- approx. 6-10 mins ( around 8.00AM)
During above period,There was interruption and meter led was glowing. As per yesterday's communication, there is no cut from UPPCL but momentary cut is there
from CIPL to isolate some society for forced cut. These short interruption may be due to that.
Power supply on GRID or DG can be verified from any electronic meter installed inside each house.
From: assotechthenest@googlegroups.com [mailto:assotechthenest@googlegroups.com]
On Behalf Of Mohd Aftab
Sent: 19 February 2014 11:32
To: allassotechresidents@googlegroups.com; assotechthenest@googlegroups.com; assotech-group
Subject: Re: Daily power cut status of UPPCL/CIPL
Hi All
There was no power cut from 18 to 19th (till 10 AM ) for Assotech. Do anyone have idea how many time Assotech was on backup(DG) ?
As per below detail, We should not be on back for single min. Why we are forced to pay extra for electricity.
Daily Power cut Status of U.P.P.C.L./C.I.P.L. Supply
Daily power cut status of UPPCL supply
From 10.00Hrs. Of 18.02.14 to 10.00Hrs. Of 19.02.14
S. No.
Date
From
To
Hrs.
Mints.
Remarks
1
18.02.14
NIL
NIL
NIL
NIL
2
19.02.14
NIL
NIL
NIL
NIL
Total Time
NIL
NIL
Regards
Aftab
On Tue, Feb 18, 2014 at 1:26 PM, Mohd Aftab
Hi All
There was no power cut from UPPCL to Crossing republic as per CIPL from 17th and 18th (18th till 10:00 a.m.).
Almost every society is facing power cut issue because of internal issue of society.
Attached is report received from CIPL.
Regards
Aftab
--
You received this message because you are subscribed to the Google Groups "Assotech The Nest" group.
To unsubscribe from this group and stop receiving emails from it, send an email to
assotechthenest+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
Disclaimer: The information contained in this communication is intended solely for the use of the individual or entity to whom it is addressed. If you are not the intended recipient, please contact the sender and delete the message without making any use or
copying it. E-Mail transmissions could be intercepted, corrupted, lost, or infected with virus. The sender therefore does not accept liability for any errors, omissions in the contents of this message or delay which may arise as a result of e-mail transmission.
Polyplex reserve the right to monitor all e-mail communications through its networks. Before opening any attachments, please check them for viruses and defects.
--
You received this message because you are subscribed to the Google Groups "Assotech The Nest" group.
To unsubscribe from this group and stop receiving emails from it, send an email to assotechthenest+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
--
This group email address has been created by the-nest-rwa@googlegroups.com (NRWA) for all residents to come on a common platform, please send posts or messages you feel are of importance / relevance to all. You may add/request co-residents of the Nest to this group to get all updates.
The Nest RWA email id remains same as the-nest-rwa@googlegroups.com.
---
You received this message because you are subscribed to the Google Groups "All Assotech Residents" group.
To unsubscribe from this group and stop receiving emails from it, send an email to allassotechresidents+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
Akhil Agarwal
DGM (PE-MECH/TG)
Engineering office Complex
NTPC,limited
Sector-24, Noida
U.P.
Mobile: 09650991280
0120-6134155(R)
Get your own FREE website, FREE domain & FREE mobile app with Company email. | Know More > |
__._,_.___
No comments:
Post a Comment