We also need to check on this matter with paramount team, as we may also being charged higher.

Sent from BlackBerry® on Airtel

From: Pratyoosh Kumar <prat_kumar6@yahoo.com>
Sender: crossings-republik@yahoogroups.com
Date: Tue, 12 Jun 2012 09:31:30 +0530
To: crossings-republik@yahoogroups.com<crossings-republik@yahoogroups.com>
ReplyTo: crossings-republik@yahoogroups.com
Cc: crossings-republik@yahoogroups.com<crossings-republik@yahoogroups.com>; croma<CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>; mahagunmascot@yahoogroups.com<mahagunmascot@yahoogroups.com>; ajnara_genx@yahoogroups.com<ajnara_genx@yahoogroups.com>; RWA Crossings Republic Infra Society \(CRIS\)<gh7rwa.crossings@gmail.com>
Subject: Re: Crossings Republik High Electricity charges by Builders(Mahagun)

 

This is an issue faced by everyone in crossing. CROMA should raise this issue with crossing infra. This should be settled.

Thanks & Regards,
Pratyoosh Kumar

Sent from my iPhone

On 12-Jun-2012, at 12:42 AM, Manmohan Jha <manmohan.jha@gmail.com> wrote:

 

We at Arihant has taken up with builder but their reply is that Crossing Infra is charging on KVH basis hence they are also charging. They said that they will discuss with management of Crossing Infra along with representative from resident.

Its not that we are paying higher amount on Supply from electricity Board but on shelter of this on Back up also builders are charging on KVH basis instead of KWH and difference per unit is 3 - 4 Rupees.   

Electricity charges paid by us are Rs. 4.19 per kVAh for UPPCL and Rs. 12.50 per kVAh for Diesel Generator.  Whereas UPPCL defined charge is Rs. 3.20 per Unit (KWH)

We are overcharged to Rs. 4.19 that too for each kVAh and not KWH. 1 kVA = 0.8 kW. So it means that for every 800 watts (instead of 1000 watts = 1 KW), we are being charged Rs. 4.19 or Rs. 12.50/ kVAh. Hence effectively we are paying 4.19/0.8 = Rs. 5.24 / kWh (for UPPCL) and 12.50/0.8 = Rs. 15.625/kWh (for D.G.).

I feel that although every individual RWA / committee are talking with respective builder but CROMA should come in picture and take up this issue with Crossing Infra. If they are not listening than it should be reported to concerned authority.



Manmohan Jha
Arihant

On Mon, Jun 11, 2012 at 8:37 PM, rajiv ranjan <raj_lovingfriend@yahoo.co.in> wrote:
 

eye opening research

thanks
rajiv


From: Amit Singh <avs810@yahoo.com>
To: croma <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>; mahagunmascot@yahoogroups.com
Cc: ajnara_genx@yahoogroups.com; crossings <crossings-republik@yahoogroups.com>; crossingsrepublikownersandmembersassociation-croma <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>; RWA Crossings Republic Infra Society (CRIS) <gh7rwa.crossings@gmail.com>
Sent: Monday, 11 June 2012 1:56 PM
Subject: Crossings Republik High Electricity charges by Builders(Mahagun)

 
Dear all,
 
Please refer the article on high electricity charges in HT property yesterday. This clearly says that builders are taking high electricity charges, but crossing /mahagun is above all and charging almost 50% higher from what it should be.
As per this article it should be Rs 2.80 per unit , but builders are charging Rs 3.20 , which is higher as per Article.
But referring to PASCHIMANCHAL VIDYUT VITRAN  NIGAM Ltd (order tariff), who is responsible for power distribution for western Uttar Pradesh (including Ghaziabad), the rates are mentioned are hereunder.
  • This traffic order clearly specifies Domestic charging basis is should be as per KWH , whereas industrial charges should be based on KVAH.
  • Apart from above the traffic power for supply at single point for bulk load for domestic load is much less than what we are paying.
              Fixed  Charge – Rs. 40.00 / kW/month (refer page 165 & 166)
Energy  Charge - Rs. 3.20/kWh (refer page 165 & 166)
If we calculate for  6 KW & 500 unit for month , the difference is as following
Detail
What we are paying (INR)
What we should pay (INR)
Difference
Fixed cahrges 
(For 6 KW connection)
6X65=
390
6X40=
240
150
Consumption cahrge
(assuming 500 unit/Month)
500X4.19=
2095
500X3.20=
1600
495
 
 